Saturday, September 5, 2009

BARE LOT

Pic of the bare lot with the house perimeter staked out.  We walked out the lot with the builder today and we will need to make some adjustments to the garage bump out to be able to move the foundation to the north in order to accommodate the walkout basement on the south side.  Drainage issues stemming from the existing neighbors improperly sloped landscape will need to be addressed with the grading of our lot.

Front Elevation, Street View of Lot, & Plot Plan below
Photobucket
Photobucket
Photobucket

No comments:

Post a Comment