MORE DRYWALL

All drywall is hung and taping has started. Soffit installation has started - color is charcoal grey and will closely match the roof color. The fascia on the lower roof lines was increased to 10" to better correspond with the upper roof fascia of 12". This was done by furring out the fascia with 2x4 material below the structural 2x6's.