Sunday, November 8, 2009

SUBFLOOR & FRAMING

Floor trusses are set and sheathed and Main Floor framing should wrap up within the next two weeks. The biggest design issue right now is determining how to deal with the elevation and south slope off the front entrance. We are currently planning some concrete planter boxes off the entrance to contain the steps and soften the slope on the south side.

Entrance Opening on Facing Wall
From House 10 2009

View from Lower Level Walkout
From House 10 2009